3rd floor update
Almost all the wall are built for the 3rd floor. Today we will start swinging roof trusses.
Saturday, February 14, 2015
Update
3rd floor exterior walls are up. Interior unit walls are now starting. The elevator shaft is up to the 3rd floor.
Monday, February 9, 2015
3rd floor
The 3rd floor is decked and exterior walls are being built. The elevator shaft is starting today.